Severity: Warning
Message: mysqli::query(): (HY000/1194): Table 'ci_sessions' is marked as crashed and should be repaired
Filename: mysqli/mysqli_driver.php
Line Number: 305
Backtrace:
File: /home/kvemo001/public_html/application/core/MY_Controller.php
Line: 7
Function: __construct
File: /home/kvemo001/public_html/index.php
Line: 318
Function: require_once
Severity: Warning
Message: session_start(): Cannot send session cache limiter - headers already sent (output started at /home/kvemo001/public_html/system/core/Exceptions.php:271)
Filename: Session/Session.php
Line Number: 143
Backtrace:
File: /home/kvemo001/public_html/application/core/MY_Controller.php
Line: 7
Function: __construct
File: /home/kvemo001/public_html/index.php
Line: 318
Function: require_once
საქართველოს ადმინისტრაციულ-ტერიტორიულ ერთეულებში, ბოლნისის, გარდაბნის, დმანისის, თეთრიწყაროს, მარნეულის, წალკის მუნიციპალიტეტებსა და ქალაქ რუსთავის მუნიციპალიტეტში
In administrative-territorial units of Georgia: Bolnisi, Gardabani, Dmanisi, Tetritskaro, Marneuli, Tsalka municipalities and City Rustavi municipality
17 February 2018
On February 16, the governor of Kvemo Kartli met with inhabitants of the city of Dmanisi.Grigol Nemsadze briefed the locals about the planned and planned projects in 2018.
Heads of the region and municipality personally listened to the needs of the population and identified with them both the current and the next few years priorities.
The rehabilitation of roofs of multi-residential residential buildings will be financed by the local budget in 2018 in Dmanisi. Estimated cost of the project is 340 000 GEL. Rehabilitation of facades of residential buildings is also planned, with a sum of 150 000 GEL.
It should be noted that In Dmanisi, in 2010, rehabilitation of 10 multi-dwelling housing roofs was carried out with 300 000 GEL.
As well as the internal streets are asphalt-rehabilitation.
Outdoor lighting systems were arranged and drainage channels were arranged.
Rehabilitation of 2 squares and kindergartens was implemented.
Taking into consideration the interests of the population, 2 ritual halls were rehabilitated.
The sport-recreational complex was built.
Rehabilitation of central stadium was carried out.